phase I
 the stromanzünder

leipzig 2011, 2012; using a conquered adress, installing a honeystove into a swamb, where batteries for medical elements were constructed and connected with soil from destructing the bottom of the building by using the hole as a mine. The prototype for 'the stromanzuender' was developed.


leipzig 2012, greifswald 2013; extracting elements, which were constructed at a conquered adress and modifiing them. The in this kind captured soul of the material was needed to can do it.